Logo top_line
Introduction
RID
KRC
Pilot Project
Opening Ceremony
top_line
Station
RID Station
Pasak Dam Station
RamaVI DAm Station
Phetchaburi Station
Kaeng Krachan Station
Tha Yang Station
Mae Kuang Station
top_line
Database
Water Level
Rainfall
Image
Water Level & Image
Test
top_line
Analysis
Flood Forecast
Reservoir Operation
Optimal Supply
top_line
Admin
Registration
Data Quality
Alarm & Setup
top_line
Logo
Rid Logo Kr Logo
385.000
350.000
Mae Kuang Dam
M.W.L
D.W.L
363.657
 EL, m
390.000
 EL, m
385.000
 EL, m
350.000
 EL, m
73.94
 M m3
28.11
 %
14:15 16-06-2018
0.0
 mm
0.0
 mm
8.2
 mm
359.2
 mm