Logo top_line
Introduction
RID
KRC
Pilot Project
Opening Ceremony
top_line
Station
RID Station
Pasak Dam Station
RamaVI DAm Station
Phetchaburi Station
Kaeng Krachan Station
Tha Yang Station
Mae Kuang Station
top_line
Database
Water Level
Rainfall
Image
Water Level & Image
Test
top_line
Analysis
Flood Forecast
Reservoir Operation
Optimal Supply
top_line
Admin
Registration
Data Quality
Alarm & Setup
top_line
Logo
Rid Logo Kr Logo
385.000
350.000
Mae Kuang Dam
M.W.L
D.W.L
365.466
 EL, m
390.000
 EL, m
385.000
 EL, m
350.000
 EL, m
85.30
 M m3
32.43
 %
17:30 21-09-2017
0.0
 mm
0.0
 mm
142.8
 mm
858.4
 mm